ORANGE COUNTY Limited |
Home | Products | Applications | About Us | Contact Us |
||||||||||||||||
|
Applications Click the thumnails for information and larger image Engine Test Bay Fuel Transfer Pipework
Double walled pipes installed on traywork in an Engine Testing Centre. Double walled flexible stainless steel pipework was run through a tortuous route to supply gasoline/ petrol and diesel to the header tanks and engine test bays. Installation of 360 metres of double walled pipe took 2 days. .
|
||||||||||||||||
| © Orange County Limited 2007 | Company No. 2967852 | t: +44(0)1388 813433 | f: +44(0)1388 813307 |