Largest new construction project in London (May 2016).
Product Solution: BRUGG Pipesystems
Project Brief: Supply and install leak monitored fuel pipes for 8 x generators and 4 x boilers feed. Pipe brackets and containment also to be installed.
Pipe: SECON-X & FSR pipes in various lengths and bore sizes. Approximately 1.5km of Brugg pipe installed.