Double walled pipes installed on traywork in an Engine Testing Centre. Double walled flexible stainless steel pipework was run through a tortuous route to supply gasoline/ petrol and diesel to the header tanks and engine test bays. Installation of 360 metres of double walled pipe took 2 days.
Engine Test Bay Fuel Transfer Pipework
![](https://www.orangecounty.co.uk/wp-content/uploads/2018/04/engine-test-bay-image1.png)