Engine Test Bay Fuel Transfer Pipework

Double walled pipes installed on traywork in an Engine Testing Centre. Double walled flexible stainless steel pipework was run through a tortuous route to supply gasoline/ petrol and diesel to the header tanks and engine test bays. Installation of 360 metres of double walled pipe took 2 days.