A new duplex pumpset and controls were designed, manufactured and installed at a major hospital energy centre. The fuelling system is supplying both boilers and diesel generators from two buried 80,000 litre fuel tanks supplied and installed by Orange County on a previous phase of the project.
Fuel system and controls installation at new hospital energy centre
![Orange County Spenny Moor System Installations Service 5](https://www.orangecounty.co.uk/wp-content/uploads/2016/05/orange-county-spenny-moor-system-installations-service-5.jpg)